25,000 metres of light inside the mountains of Kühtai.
At Kühtai in Tyrol, a new reservoir and an underground pumped storage plant are being built inside the mountain. Promitto delivered 25,000 metres of LED strip with emergency lighting for the tunnels.
Austria

25,000 m
LED strip with emergency lighting
2022
Delivered
The need
Long tunnels deep inside the mountain, with no daylight at all. The light has to be even over long distances, and if the power fails, people must still be able to see the way out.
The solution
M-Flex LED strip, made for the project with a lower light level to save power while still giving the light needed. Emergency modules keep the strip lit if the power fails.
The result
25,000 metres of continuous light through the tunnels, and a lit way out if the power fails.
PRODUCTS
Delivered to this project
MORE PROJECTS
More projects
Plan your setup with a dealer.
Our dealers stock the system, advise on setup and deliver to site.